WAIS HIVE Extension & Lighting Replacement

NJP Electrical Services delivered a staged lighting and emergency lighting upgrade for VenuesWest at the WA Institute of Sport High Performance Service Centre.

Working within a live, high-performance sporting facility, the project was carefully planned and delivered to minimise disruption to athletes, coaches, staff and day-to-day operations.

Client

VenuesWest

Location

WA Institute of Sport (WAIS) High Performance Service Centre

Project

HIVE Extension & Lighting Replacement

Completed

September 2026

Wais Featured Image
PROJECT OVERVIEW

Project at a Glance

VenuesWest engaged NJP Electrical Services to replace end-of-life lighting infrastructure and upgrade emergency lighting throughout the WA Institute of Sport High Performance Service Centre.

The works extended across the basketball court, running track and multi-use area, gym, Level 1 reception and offices, as well as emergency lighting throughout the facility.

With WAIS remaining fully operational throughout the project, the works required careful staging, specialised access solutions and close coordination with VenuesWest to maintain safe access and minimise disruption.

SCOPE OF WORKS

What We Delivered

1

Lighting Replacement

Replacement of end-of-life lighting infrastructure across key sporting, training and office areas within the facility.

2

Emergency Lighting Upgrade

Upgrade and integration of emergency lighting into the new Clevertronics HIVE emergency lighting system.

3

C-Bus Integration

Programming and validation of the existing C-Bus lighting control system to integrate the upgraded lighting infrastructure.

4

Testing & Commissioning

Functional testing of new fittings, emergency lighting compliance testing, lux-level verification and defect rectification, followed by as-constructed drawings and O&M documentation at handover.

Wais 06 Gymnasium
OUR APPROACH

Staged, Zone-Based Delivery

With the facility remaining in near-continuous use, NJP delivered the project using a staged, zone-based methodology aligned with WAIS operations.

Each area required a tailored access and protection strategy:

Running Run

Running Track

A Spider Lift was driven along the centreline, providing access to lighting on both sides while minimising contact with the specialised track surface.

Basketball Icon

Basketball Court

AURA-compliant surface protection was installed, incorporating a 200-micron protective layer and 12mm plywood for load distribution. A lightweight one-man lift was then used to complete the works without direct wheel contact with the court.

Weightlifting Icon

Gym

Works were scheduled for weekends using a minimal-footprint one-man lift, with gym equipment protected throughout.

Real Estate Stairs Icon

Offices & Stairs

Platform ladders and purpose-built scaffold systems allowed works to be completed without the need for heavy plant.
Pre-construction planning, site verification and daily coordination with VenuesWest helped keep the wider facility operational throughout each stage of the project.

SAFETY & COMPLIANCE

Safety at Every Stage

Working at height within an operational sporting facility required careful management of access, electrical isolation and the protection of both people and specialised surfaces.

NJP implemented SWMS and JSAs for high-risk activities, supported by daily pre-starts and toolbox meetings. Controls were established for working at heights, EWP use, electrical isolation and manual handling, with all personnel inducted through the VenuesWest Rapid Global system.

Electrical testing was completed in accordance with AS 3017 and applicable Electricity Regulations.

Wais 03 Running Track
Wais 12 Access Plant Laydown
SUSTAINABILITY

Recycling & Material Recovery

The WAIS lighting and emergency lighting upgrade involved the removal of a significant volume of end-of-life electrical equipment, including light fittings, cable, aluminium components, control gear and emergency lighting battery components.

Throughout the works, NJP separated recoverable materials at the source into dedicated recycling streams rather than disposing of removed equipment as mixed general waste. Copper and cable, aluminium, extrusions, mixed metal and battery components were separated, alongside cardboard generated throughout the project. Materials were then weighed and documented by material type and quantity, creating a clear and traceable material recovery record for project close-out.

1,187.4 kg

Total Recycled

1,101 kg

Metal Recycled

86.4 kg

Cardboard Recycled

By project completion, 1,187.4 kg of material had been recycled, comprising 1,101 kg of metal and 86.4 kg of cardboard. The final results were verified through recycling dockets and recorded project cardboard weights.

This was particularly important for the emergency lighting component of the project, where the upgrade and extension of the Clevertronics HIVE system required existing emergency lighting equipment and battery components to be removed and appropriately managed.

The initiative also became an opportunity to involve NJP’s apprentices and younger team members in material separation and responsible waste practices. Their participation helped reinforce environmental awareness and better material-management habits as part of everyday project delivery.

This approach reflects NJP’s broader commitment to practical, measurable material recovery: separating what can be recovered, documenting the outcomes and providing clients with evidence of waste diversion as part of responsible project close-out.

Learn more about NJP’s approach to Recycling & Material Recovery →

PROJECT OUTCOME

Delivered Safely, With Minimal Disruption

The WAIS HIVE Extension & Lighting Replacement was delivered on programme with minimal disruption to WAIS operations, athletes and staff.

The project achieved zero recordable safety incidents and zero sports-surface damage events, while successfully delivering upgraded lighting, emergency lighting and control infrastructure across the operational high-performance facility.

CLIENT FEEDBACK

What VenuesWest Had to Say

“NJP Electrical demonstrated a professional and collaborative approach … implemented a staged delivery methodology that minimised disruption to athletes, staff, and venue operations.”

“Enabled beneficial outcomes to be achieved without additional cost to the project, demonstrating a strong commitment to value for money and client satisfaction.”

“I would have no hesitation in recommending them for future electrical, lighting, emergency lighting, and infrastructure upgrade projects.”

Timothy Oakley

Capital Works Project Manager, VenuesWest (WAIS Projects)